ENGINEERING PROJECTS & GLOBAL APPLICATION
In May 2026, the export-oriented Indonesian double-layer, single-row reinforced 200-series galvanized Bailey bridge, constructed by CCCC Dredging (Group) Co., Ltd., was successfully installed and officially opened to traffic.
The bridge has a total length of 30 meters. Its main structure adopts reinforced 200-series Bailey panels, which are double-layer stacked and single-row connected, significantly enhancing load-bearing capacity and flexural rigidity to meet heavy-duty traffic requirements.
To withstand Indonesia's hot, humid, and marine climate, the entire bridge was treated with hot-dip galvanization for corrosion protection, ensuring structural durability.
The project utilized prefabricated construction methods, resulting in a short construction period and high efficiency. It has effectively alleviated local traffic pressure, demonstrating the outstanding competitiveness of Chinese bridge manufacturing and construction technology in overseas markets, and stands as a notable achievement in China-Indonesia infrastructure cooperation.