ENGINEERING PROJECTS & GLOBAL APPLICATION
Project Name: Municipal Transportation Project in Zhengzhou High-tech Zone
Project Location: Zhengzhou High-tech Zone, Henan Province, China
Product Used: Double-Single Reinforced Bailey Bridge (Type 200) with Two Lanes
Project Overview: The bridge features a double-single truss configuration assembled from Bailey panels. As a reinforced Type 200 structure, it is designed to accommodate two-lane traffic with a single span of 24 meters. The main structure is finished in blue steel, with anti-slip steel plates used for the deck, ensuring high structural strength and rapid assembly. A traffic sign with a 13-ton load limit is installed at the bridge entrance, clearly indicating the load capacity to ensure structural safety. Situated adjacent to urban arterial roads and residential areas, the site is surrounded by high-rise buildings, parking lots, and green belts, making it a typical example of an urban temporary traffic maintenance project.